Show/Hide
  • City Hall relocating effective Mon., Dec. 18. Phones temporarily down - interim number


    Beginning Monday, Dec. 18, please visit the Peachtree Corners City Hall at its new location, 310 Technology Parkway.

Staff

More
Rendering of the multi-use trail with trees and people biking and walking.

Multi-Use Trail

Print
Press Enter to show all options, press Tab go to next option

The Peachtree Corners 2015 Livable Centers Initiative (LCI) study indicated walking and biking trails were the the most desired public amenities.

In response to this and to a 2016 workshop and online survey, the city has begun construction of an 11.5 mile multi-use trail system. The trail will crisscross through the community connecting residents with shops, restaurants and office parks.

For questions regarding the plans for the trail or the relevant studies, please contact Community Development Director, Diana Wheeler at dwheeler@peachtreecornersga.gov.

Key

Existing Trails
These trails already exist in the city.

LCI Framework Validated Trail
Feasibility of building the trail is high with no major engineering required.

Modified Trail Route
Trails that would create small and large loops within the network.

Low Paved Trail Feasibility
Feasibility of building a paved trail is low but an unpaved trail or sidewalk could be built.

Potential Trail Hub or Open Space
Open, green area or park with benches.

 

Multi-Use Trail map showing the planned trail system within the 2014 Livable Centers Initiative area.

  View the PDF version of the map